|  | pvc卷材塑膠地板鋪裝施工流程2020-06-04 14:26來(lai)源:優(you)尚(shang)作者:安耐(nai)寶瀏覽數:6263次 
 pvc地(di)(di)(di)(di)板(ban)施(shi)(shi)工分為:自(zi)流(liu)平施(shi)(shi)工、地(di)(di)(di)(di)板(ban)鋪(pu)(pu)裝施(shi)(shi)工。鋪(pu)(pu)裝又分為:滿(man)刮(gua)(gua)膠(jiao)鋪(pu)(pu)裝、粘膠(jiao)帶(dai)鋪(pu)(pu)裝。自(zi)流(liu)平施(shi)(shi)工在地(di)(di)(di)(di)板(ban)鋪(pu)(pu)裝之前(qian)進行,滿(man)刮(gua)(gua)膠(jiao)鋪(pu)(pu)裝適于幼兒園地(di)(di)(di)(di)板(ban)、商用地(di)(di)(di)(di)板(ban),粘膠(jiao)帶(dai)鋪(pu)(pu)裝適于運動(dong)地(di)(di)(di)(di)板(ban)、舞蹈地(di)(di)(di)(di)板(ban)。滿(man)刮(gua)(gua)膠(jiao)鋪(pu)(pu)裝又分:卷材鋪(pu)(pu)裝和片(pian)材鋪(pu)(pu)裝。下面只針對(dui)卷材地(di)(di)(di)(di)板(ban)介紹(shao)。 pvc地板鋪裝施工(gong)流程--滿刮膠 工序一:預(yu)鋪。要求(qiu):地面堅實、不起沙、不起粉、整(zheng)(zheng)潔(jie)干燥,2米范(fan)圍內高低差2mm以內或打磨平整(zheng)(zheng)、清理(li)干凈的自流(liu)平;材料:pvc地(di)板(帶卷號);方(fang)法:按卷號對齊鋪(pu)設。 
 工序二:刮膠。要求:預(yu)鋪好的(de)地板;工(gong)具(ju):專用(yong)刮膠(jiao)板(ban);材料(liao):pvc地板(ban)專用(yong)膠(jiao)水;方法:卷起(qi)整(zheng)塊(kuai)預鋪地板(ban)到一(yi)半,倒適(shi)量(liang)膠水于地面,用刮膠板(ban)均(jun)勻(yun)刮開。 
 工序三:鋪設。要求:膠(jiao)不(bu)黏(nian)手(刮膠(jiao)后約20分鐘);工具:軟木板;方法:膠不黏手后鋪開卷起的地板(ban),用軟(ruan)木板(ban)刮平推實;鋪好后,再卷起另一(yi)半刮膠鋪設。 
 工序四:修整。要求:整塊地膠鋪設完成;工(gong)具:鋼尺(chi)、勾刀或壁(bi)紙刀;方法:邊(bian)角多余部(bu)分(fen)鋼(gang)尺壓齊后,用勾刀或壁紙刀割去;打掃清理現場。 
 工序五:開槽(cao)連接。要求(qiu):鋪(pu)設修整完成;工具:鋼(gang)尺、開槽器、焊(han)槍、月牙鏟(chan)刀(dao)或修平器;材料:焊(han)線;方法:1. 開(kai)槽(cao)(cao)(cao)---沿地板接縫將鋼尺對齊,用開(kai)槽(cao)(cao)(cao)刀開(kai)槽(cao)(cao)(cao),開(kai)槽(cao)(cao)(cao)長度控制在地板總厚(hou)度的三分(fen)之一處(chu)。2. 連(lian)接(jie)---焊(han)槍沿(yan)開(kai)槽位置(zhi)連(lian)接(jie),完成后用月(yue)牙(ya)鏟(chan)刀將凸(tu)起焊(han)線修平。 
 pvc地板鋪裝施工流(liu)程--粘膠帶 工序一:預鋪。與滿刮(gua)膠工序一相同。 
 工序二:粘接。要求:預(yu)鋪好的地板;工具:記(ji)號筆;材料(liao):膠帶;方法(fa):1. 劃(hua)線(xian)---用記(ji)號筆沿接縫劃(hua)線(xian)。2. 粘(zhan)膠帶(dai)---膠帶(dai)中間對齊黑(hei)線粘(zhan)貼,撕(si)去蠟紙。3. 固(gu)定(ding)(ding)地板---先固(gu)定(ding)(ding)一(yi)側(ce)地板,另(ling)一(yi)側(ce)向已固(gu)定(ding)(ding)一(yi)側(ce)貼緊后(hou)壓實。 
 工序三:修整。與(yu)滿刮膠工序四相同。 
 工序四:開槽連接。與滿刮(gua)膠工序五相(xiang)同。 